Proposed DC for the Kalayaan PSH
Post date: Tuesday, 18 March 2025 04:11PM

Call for Comments on the proposed Department Circular, titled PROVIDING SPECIFIC POLICY FOR THE OPTIMAL UTILIZATION OF THE KALAYAAN PUMPED-STORAGE POWER PLANT PHASE I AND II”.

The Department of Energy (DOE) is hereby requesting all interested parties to submit their comments and inputs on the proposed Department Circular (DC) titled, “Providing Specific Policy for the Optimal Utilization of the Kalayaan Pumped-Storage Power Plant Phase I and II”.

The DOE is pleased to announce the conduct of virtual Public Consultation for the abovementioned proposed DC on 21 March 2025, 10:00am via MS Teams.

Kindly submit your comments and/or inputs to [email protected] on or before 20 March 2025 at 12NN. Email Subject: Comments to the DC for the KPSPP.

Registration Link and QR Code:

 

 

 

 

 

 

 

https://bit.ly/PubCon_KPSPP

 

The meeting link will be provided upon accomplishment of the registration form.

Attachments (Click to view/download file): 

 

  1. Draft Department Circular

 

  1. Template for Comments

 

In case you have clarifications, please feel free to contact Mr. Ariel D. Fronda, OIC-HOEMD at 8840-2286 loc. 245/337 or via email at [email protected].

EVCS Unbundling Advisory: “BE INFORMED: DOE – Electric Vehicle Charging Stations (EVCS) Unbundled Charging Fees for the month of March 2025."
Post date: Monday, 17 March 2025 08:17AM

EVCS Unbundling Advisory: 

 

“BE INFORMED: DOE – Electric Vehicle Charging Stations (EVCS) Unbundled Charging Fees for the month of March 2025." 

Navigating through the costs of charging electric vehicles just got easier. Find out how much it costs to charge your electric vehicle and where you can charge for free.  

You can check the Department of Energy’s unbundled charging fee structure to know the breakdown of the charges as mandated by the EVIDA-Implementing Rules and Regulations (EVIDA-IRR). 

If you want to learn more about the electric vehicle industry or information on electric vehicle charging stations in the Philippines, visit our EV Industry Portal. 

 

Attachment (Click to view/download PD file):
Invitation to the Final Public Consultation of the Draft Implementing Guidelines for the Obligations of Electric Vehicle Charging Station (EVCS) Providers, and EVCS Requirements, Specifications and Interconnectivity (ORSI)
Post date: Friday, 28 February 2025 08:51AM

The Department of Energy is inviting all concerned parties to join the Final Public Consultation of the Draft Implementing Guidelines for the Obligations of Electric Vehicle Charging Station (EVCS) Providers, and EVCS Requirements, Specifications and Interconnectivity (ORSI) on Tuesday, 11 March 2025 at 9:00 A.M. – 12 NN via Zoom Meeting platform

Registration QR Code and link:  

Attachment (Click to view/download PD file):

Pages