(Taguig City). The Department of Energy (DOE) reports that at 1:46 p.m. today (06 September 2016), Line 1 and Line 2 of the Makban-Batangas 230kV transmission line tripped, resulting in the isolation of the following large power plants with a total capacity of 1,030 MW:
1. San Lorenzo (2x255 MW)
2. Avion (100 MW)
3. San Gabriel (420 MW)
As a result, the Luzon Grid... Read more