Power Situation Update 14 April 2019 (as of 4:30pm)

 

I. Normal Condition Issuance 

The NGCP issued a Normal Condition advisory for the Luzon Grid today.

II. Entry of Power Plants

South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 AM yesterday and achieved full load at 8:50 AM.

III. Forced Outages and Derated Plants

Masinloc Unit 1 of San Miguel is running on a derated capacity of 304 MW. 

Please refer to the table for the updated list of power plants that are derated and on forced outage. 

Unplanned/Forced Outage

Power Plant Installed Capacity (MW) Cause Date Out Estimated Date In

SMC Consolidated Power Corporation (SMCCPC)

Limay U2

150 Boiler tube leak 11-Apr-2019 16-Apr-2019*

TeaM Energy Corporation

Sual U1

647 Boiler Circulating Pump piping leak 09-Apr-2019 18-Apr-2019*

Southwest Luzon Power Generation Corporation

(SLPGC) U2

150 Vibration in Primary Air Fan 07-Apr-2019 21-Apr-2019

Pagbilao Energy Corporation (PEC)

Pagbilao U3

420 Boiler slagging 02-Apr-2019 16-Apr-2019
Total 1,367      

 

De-rated/Reduced Capacity

Power Plant Installed Capacity (MW) Declared Capacity (MW) Derating/Reduced Capacity (MW) Cause

Masinloc Power Partners Co. Ltd. (MPPCL)

Masinloc U1

315 304 11 TBD

SEM-Calaca Power Corporation (SCPC)

Calaca U2

300 200 100 Hald condenser operation
Total     111  

Source: NGCP, concerned power plants

*preliminary information

TBD-to be determined

 

The DOE will continue to update the public on further developments. 

###

Media Group Category: 

Power Situation Update 14 April 2019 (as of 11:20am)

I. Normal Condition Issuance 

The NGCP issued a Normal Condition advisory for the Luzon Grid today.

II. Entry of Power Plants

South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 AM yesterday and achieved full load at 8:50 AM.

III. Forced Outages

Please refer to the table for the updated list of power plants that are derated and on forced outage. 

Unplanned/Forced Outage of Power Plants

Power Plant Installed Capacity (MW) Cause Date Out Estimated Date In

Panasia Energy Inc. (PEI)

Limay A1

70 Tripped due to actuation of turbine overspeed relay 13-Apr-2019 TBD

SMC Consolidated Power Corporation (SMCCPC)

Limay U2

150 Boiler tube leak 11-Apr-2019 16-Apr-2019*

TeaM Energy Corporation

Sual U1

647 Boiler Circulating Pump piping leak 09-Apr-2019 18-Apr-2019*

Southwest Luzon Power Generation Corporation (SLPGC)

U2

150 Vibration in Primary Air Fan 07-Apr-2019 21-Apr-2019

Pagbilao Energy Corporation (PEC) 

Pagbilao U3

420 Boiler slagging 02-Apr-2019 16-Apr-2019
Total 1,437      

Source: NGCP, concerned power plants

*preliminary information

TBD- to be determined

De-rated/Reduced Capacity of Power Plants

Power Plant Installed Capacity (MW)  Declared Capacity (MW) Derating/Reduced Capacity (MW) Cause

SEM-Calaca Power Corporation (SCPC)

Calaca U2

300 200 100 Half condenser operation
Total     100  

Source: NGCP, concerned power plants

 

The DOE will continue to update the public on further developments. 

###

Media Group Category: 

Power Situation Update 13 April 2019 (as of 11:20am)

I. Yellow Alert Issuance 

The NGCP has issued a Yellow Alert advisory for the Luzon Grid from 10:01 AM to 5:00 PM and 7:00 PM to 10:00 PM today.

II. Entry of Power Plants

South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 AM today and achieved full load at 8:50 AM.

III. Changeover of First Gen's San Gabriel Nat Gas Plant

Starting 1:00 PM today, the 420 MW total capacity of San Gabriel will be reduced by 210 MW due to gas volume restrictions.

This restriction will only take effect over the weekend to give way to the necessary line pack recovery in preparation for weekday demand. In this regard, one unit of Santa Rita will be operating on liquid fuel to ensure that all units of the Santa Rita, San Lorenzo, and San Gabriel plants will be able to run on their maximum outputs.

Initial NGCP assessment indicates that the changeover will not have any impact on the situation of the grid.

IV. Forced Outage of Pan Asia Energy Inc.'s Limay A1

At 12:41 AM today, Limay A1 (70 MW) went on forced outage due to a tripping from actuation of turbine overspeed relay. 

Please refer to the table for the updated list of power plants that are derated and on forced outage. 

Unplanned/Forced Outage of Power Plants
Power Plant Installed Capacity (MW) Cause Date Out Estimated Date In

Panasia ENergy, Inc. (PEI) 

Limay A1

70 Tripped due to actuation of turbine overspeed relay 13-Apr-2019 TBD

SMC Consolidated Power Corporation (SMCCPC)

Limay U2

150 Boiler tube leak 11-Apr-2019 16-Apr-2019*

Team Energy Corporation

Sual U1

647 Boiler Circulating Pump piping leak 09-Apr-2019 18-Apr-2019*

Southwest Luzon Power Generation

(SLPGC) U2

150 Vibration in Primary Air Fan 07-Apr-2019 21-Apr-2019

Pagbilao Energy Corporation

(PEC) Pagbilao U3

420 Boiler slagging 02-Apr-2019 16-Apr-2019
Total 1,437      

Source: NGCP, concerned power plants

*preliminary information

TBD- To be determined

De-rated/Reduced Capacity of Power Plants

Power Plant Installed Capacity (MW) Declared Capacity (MW) Derating/Reduced Capacity (MW) Cause

SEM-Calaca Power Corporation 

(SCPC) Calaca U2

300 200 100 Half condenser operation
Total     100  

Source: NGCP, concerned power plants

The DOE will continue to update the public on further developments. 

###

Media Group Category: 

YELLOW ALERT ADVISORY as of 11:20 AM

POWER SITUATION UPDATE
(as of 11:20 AM) 

I. Yellow Alert Issuance 

The NGCP has issued a Yellow Alert advisory for the Luzon Grid from 10:01 AM to 5:00 PM and 7:00 PM to 10:00 PM today.

II. Entry of Power Plants

South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala is now running on full load. It was synchronized to the grid at 2:03 AM today and achieved full load at 8:50 AM.

III. Changeover of First Gen's San Gabriel Nat Gas Plant

Starting 1:00 PM today, the 420 MW total capacity of San Gabriel will be reduced by 210 MW due to gas volume restrictions.

This restriction will only take effect over the weekend to give way to the necessary line pack recovery in preparation for weekday demand. In this regard, one unit of Santa Rita will be operating on liquid fuel to ensure that all units of the Santa Rita, San Lorenzo, and San Gabriel plants will be able to run on their maximum outputs.

Initial NGCP assessment indicates that the changeover will not have any impact on the situation of the grid.

IV. Forced Outage of Pan Asia Energy Inc.'s Limay A1

At 12:41 AM today, Limay A1 (70 MW) went on forced outage due to a tripping from actuation of turbine overspeed relay. 

Please refer to the table for the updated list of power plants that are derated and on forced outage. 

The DOE will continue to update the public on further developments. 

###

LUZON POWER PLANT OUTAGES/DERATED

As of 13 April 2019, Saturday, 11:20 AM

Unplanned/Forced Outage

Power Plant

Installed Capacity (MW)

Cause

Date & Time Out

Date & Time In

Panasia Energy Inc. (PEI)

Limay A1

70

Tripped due to actuation of turbine overspeed relay

13-Apr-2019

TBD

SMC Consolidated Power Corporation (SMCCPC) Limay U2

150

Boiler tube leak

11-Apr-2019

16-Apr-2019*

TeaM Energy Corporation Sual U1

647

Boiler Circulating Pump piping leak

09-Apr-2019

18-Apr-2019*

Southwest Luzon Power Generation Corporation (SLPGC) U2

150

Vibration in Primary Air Fan

07-Apr-2019

21-Apr-2019

Pagbilao Energy Corporation (PEC) Pagbilao U3

420

Boiler slagging

02-Apr-2019

16-Apr-2019

Total

1,437

 

 

 

 

Source: NGCP, concerned power plants

*preliminary information

TBD – To be determined

 

De-rated Power Plants

Power Plant

Installed Capacity (MW)

Declared Capacity (MW)

Derating (MW)

Cause

SEM-Calaca Power Corporation (SCPC) Calaca U2

300

200

100

Half condenser operation

Total

 

 

100

 

 

Source: NGCP, concerned power plants

Media Group Category: 

LUZON POWER SITUATION

I. Yellow and Red Alert Notice

The National Grid Corporation of the Philippines (NGCP) issued the following Alert Notices “due to major generation inadequacy”. 

Yellow 8:01am - 9:00am

Red Alert. 9:01am - 10:00pm

Yellow Alert. 10:01pm to 11:00pm

These alert statuses are caused by the recent unplanned outage of:

1. San Miguel Consolidated Power Corp. (SCPC) Unit 2 (150MW) at around 4:28 pm.

This plant has been added to the earlier list of unplanned outages released by the DOE:

2.  Sual Unit I of Team Energy and San Miguel (647MW);

3.  Southwest Luzon Power Generation Corp. (SLPGC) Unit 2 of DMCI (150 MW); 

4. Pagbilao Unit 3 of Team Energy and Aboitiz Power (420MW); and 

5.  South Luzon Thermal Energy Corp. (SLTEC) Unit 1 of Ayala (135MW) 

Moreover, additional losses of MW were due to the following:

6. The de-rated capacity of DMCI's Calaca Unit 2 (100 MW); and

7. 827 MW from previously approved outages due to scheduled maintenance.  

LUZON POWER PLANT OUTAGES/DERATED

Unplanned/Forced Outage

Power Plant

Installed Capacity (MW)

Cause

Date & Time Out

Date & Time In

Panasia Energy, Inc. (PEI)

Limay A1

60

Generator Speed measuring disturbance alarm

11-Apr-2019

11-Apr-2019

SMC Consolidated Power Corporation (SMCCPC) Limay U2

150

Boiler tube leak

11-Apr-2019

16-Apr-2019*

TeaM Energy Corporation Sual U1

647

Boiler Circulating Pump piping leak

09-Apr-2019

13-Apr-2019*

Southwest Luzon Power Generation Corporation (SLPGC) U2

150

Vibration in Primary Air Fan

07-Apr-2019

21-Apr-2019

Pagbilao Energy Corporation (PEC) Pagbilao U3

420

Boiler slagging

02-Apr-2019

16-Apr-2019

South Luzon Thermal Energy Corporation (SLTEC) U1

135

Boiler tube leak

20-Mar-2019

13-Apr-2019

Total

1,562

 

 

 

                                                 Source: NGCP, concerned power plants

                                                 *preliminary information

                                                 TBD – To be determined

De-rated Power Plants

Power Plant

Installed Capacity (MW)

Declared Capacity (MW)

Derating (MW)

Cause

SEM-Calaca Power Corporation (SCPC) Calaca U2

300

200

100

Half condenser operation

Total

 

 

100

 

                                                  Source: NGCP, concerned power plants

II. ACTIONS TAKEN

The DOE called for an emergency meeting with NGCP last night and will conduct a follow-up meeting today with the ERC, NGCP, IEMOP, and MERALCO to coordinate efforts and address the situation.

###